CWLS09SC Geosteering (Logging While Drilling)
GeoSteering LLC
Drilling the Target: Understanding why is it The Target?
- Geology
- Reservoir considerations
Target Uncertainties for geosteering
Geosteering the well in 2 parts:
- Landing properly
- Staying in the Drain
Geosteering the Landing
- Markers
- True Stratigraphic Thickness
- Apparent dip computations
- Trajectory design
- BHA design
- Depth references
Geosteering the Drain
- Data required to prepare and geosteer a horizontal well.
- LWD Measurements used to geosteer, and their effects on the geosteering decisions
- Using Images in geosteering wells
- TST: Using GR only when GR is active enough
Location: Nexen Annex B 801 7th Ave SW
Leader: Sue Bruce
Dates: May 5, 2010
Max Attendance: 30 participants
Trip/Course Fee: pre-early bird: $450, post-early bird: $500
